Getting Connected
What to expect when you've chosen to convert
Generally, it takes approximately six
to ten weeks to have the natural gas service line installed from the gas main
to your home. The length of time can vary, however, depending on scheduling,
permits, terrain, weather conditions, time of the year, if we need to extend
the main and other factors. Once the underground line to your home or business
is completed, contact your heating contractor to have the interior gas piping
installed and inspected. Make sure your heating contractor confirms
the installation of the gas service with Washington Gas prior to removing your
existing appliances. After your new equipment and piping is installed,
you must call Washington Gas at 703-750-1000 to have your natural gas
meter installed. Certain appliances may require separate metering (gaslights,
pool heaters and back-up generators).